ch en ua ru
Kyiv:
Roads:
  • 24.08.2010 08:13:51 -
  • 16.08.2010 17:43:01 -
  • 13.08.2010 21:56:39 -
  • 09.08.2010 14:10:00 -
  • 06.08.2010 12:47:31 -
 


Уважаемые посетители, на сайте ИА «Друга Смуга» открылся форум.

Desnianskyi
Myloslavska Street
03.07.2008 16:46:00  Viewings: 1643
House construction.
Terms for repair works to be carried out: May 20, 2006 – August 25, 2008.
Marksa Street – Balzaka Street
09.06.2008 08:00:00  Viewings: 2277
Underground communications building.
Partial blocking of a roadway.
Term for repair works to be carried out: November 7, 2007 – July 30, 2008.
Kioto Street, 2
06.06.2008 08:00:00  Viewings: 1545
Sewerage system collector.
Partial blocking of a road way: 2 m wide, 6 m long.
Terms for repair works to be carried out: March 10, 2006 – July 30, 2008.
Lisnyi Avenue
06.06.2008 08:00:00  Viewings: 1391
Sewerage system collector.
Partial blocking of a road way: 5.5 m wide, 6.5 m long.
Terms for repair works to be carried out: June 4, 2006 – June 20, 2008.
Troieschyna
28.01.2008 14:42:55  Viewings: 1521
Engineering communications mounting.
Partial blocking of a road way: 2 m wide, 7 m long.
Terms for repair works to be carried out: April 26, 2006 – January 30, 2008