ch en ua ru
Kyiv:
Roads:
  • 24.08.2010 08:13:51 -
  • 16.08.2010 17:43:01 -
  • 13.08.2010 21:56:39 -
  • 09.08.2010 14:10:00 -
  • 06.08.2010 12:47:31 -
 


Уважаемые посетители, на сайте ИА «Друга Смуга» открылся форум.

Dniprovskyi
Mykytenka Street.
06.06.2008 08:00:00  Viewings: 1421
Sewerage system reconstruction.
6 meters of roadway are blocked.
Term for repair works to be carried out: July 3, 2006 – July 19, 2008.
Vatutina Avenue
04.06.2008 08:00:00  Viewings: 1410
Building of interweaving lanes.
1 meter of road way is blocked.
Term for works to be carried out: October 1, 2007 – July 20, 2008.