ch en ua ru
 


Shevchenkivskyi
Vetrova Street
06.06.2008 08:00:00  Viewings: 1111
Dwelling house construction. Complete roadway blocking.
Period of repair works: from February 01, 2008 till August 01, 2008.
Starovokzalna Street – Zhylianska Street
04.06.2008 08:00:00  Viewings: 1255
Electricity supply network installation.
Partial blocking of a roadway (4.5 meters wide, 2.25 meters long).
Term for repair works: July 10, 2007 – July 10, 2008.
Studentska Street, 16/11
04.06.2008 08:00:00  Viewings: 1146
Repair house fencing.
Complete blocking of a road way.
Term for the repair works to be carried out: April 25, 2000 – July 1, 2008.
Artema Street, 26, 38, 40, 50, Vorovskogo Street 7b
03.06.2008 08:00:00  Viewings: 1329
Water supply line and sewerage system repair.
Partial blocking of a roadway (7 meters wide).
Term for repair works: May 22, 2007 – September 6, 2008.
Mykhailivska Street, 12
03.06.2008 08:00:00  Viewings: 1140
Institute for chemistry
Partial blocking of a roadway (1.5 meters wide, 3.0 meters long).
Term for repair works: April 14, 2007 – November 1, 2008.
Ул. Коперника 12а
03.06.2008 08:00:00  Viewings: 1153

Монтаж канализационного коллектора.
Блокирование проезжей части шириной 3,2 м, длиной 12 м.
Срок проведения ремонтных работ: с 9 апреля 2008 года по 1 августа 2008 года.

Dymytriievska Stret – Pavlovska Street
24.04.2008 08:00:00  Viewings: 1409
Water pipeline repair.
Partial blocking of a road way: 1.5 m wide, 15 m long.
Terms for repair works to be carried out: November 8, 2006 – April 27, 2008.
Borschahovska Street, Sholudenka Street, Tymofiieva Street
15.04.2008 08:00:00  Viewings: 1259
Underground construction.
Partial blocking of a roadway (2 meters wide).
Term for repair works to be carried out: April 4, 2007 – April 20, 2008.
Schuseeva Street
27.03.2008 08:07:28  Viewings: 1062
Construction of underground crossing. Partial blocking of a road way (7.2 m width, 30 m long).
Period of repair works: from February 28, 2008 till April 01, 2008.
Observatorna Street
26.03.2008 08:15:54  Viewings: 1110
House construction.
Partial blocking of a road way (4 m wide, 30 m long).
Term for the repair works to be carried out: November 12, 2004 – March 30, 2008.
Peremohy Avenue - Borschahivska Street
26.02.2008 08:11:07  Viewings: 991
Rain sewage system mounting.
Partial blocking of a road way (3 m wide, 100 m long).
Term for works to be implemented: Jan 21, 2008 - March 1, 2008



Khokhlovykh Street, 7
08.02.2008 11:30:56  Viewings: 1029
Water pipeline repair.
Partial blocking of a road way: 3 m wide, 9 m long.

Terms for repair works to be carried out: January 15, 2008 – January 21, 2008.